Risk Management Analysis in the Implementation of the Mataram Mayor's Office Development Project
Downloads
In the implementation of construction projects, particularly the Mataram Mayor's Office Development Project, various risks may lead to cost overruns, delays in project completion, and reduced work quality. During the construction phase, contractors face various uncertainties; therefore, effective risk management is required. This study aims to identify risk sources, conduct risk assessments, and formulate risk mitigation strategies. The method employed in this study is the Risk Breakdown Structure (RBS) for risk identification and the AS/NZS 4360:2004 standard for determining risk levels and categories. The identification results revealed that 44 risk variables were identified in the project. Following the risk assessment, 6 risks were categorized as high risk, 30 risks as medium risk, and 8 risks as low risk. Risk management strategies are implemented through monitoring and supervision to strengthen supply chains, manage logistics, and ensure preparedness in addressing uncertainties such as delays and material shortages. Furthermore, improving work culture, implementing Occupational Health and Safety Management (OHSM), applying systematic change management, enhancing effective communication, and developing adaptive weather planning are key measures to minimize risks and maintain project continuity.
ALSaadi, N., & Norhayatizakuan, N. (2021). The impact of risk management practices on the performance of construction projects. Studies of Applied Economics, 39(4). https://doi.org/10.25115/eea.v39i4.4164
Alshihri, S., Al-Gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7), 902.
Alshehhi, H. (2024). The impact of risk management on the performance of construction projects. Proceedings of Social Science and Humanities Research Association (SSHRA). https://doi.org/10.20319/icbellp.207208
Antoniou, F., & Tsioulpa, A. V. (2024). Assessing the delay, cost, and quality risks of claims on construction contract performance. Buildings, 14(2), 333.
Ayuza, F. (2025). Integrated risk management in the life cycle stages of construction projects in Indonesia. Journal of Authentic Research. https://doi.org/10.36312/jar.v4ispecialissue.3335
Bepari, M., Narkhede, B., & Raut, R. (2024). A comparative study of project risk management with risk breakdown structure (RBS): A case of commercial construction in India. International Journal of Construction Management, 24, 673–682. https://doi.org/10.1080/15623599.2022.2124657
Chammout, B., El-Adaway, I. H., Abdul Nabi, M., & Assaad, R. H. (2024). Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(9), 04024109.
Fakhereldin, F. (2024). Construction claims management practices and dispute resolution mechanisms in construction contracts.
Habetemeherit, A., Mengistu, D., Sorsa, F., & Tesfaye, B. (2025). Causes and impacts of public construction projects’ contract terminations. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-09-2024-1217
Haqi, F. I. (2023). From policies to actions: Mayoral leadership and local government’s impact on urban resilience in Indonesia. Journal of Resilient Economies, 3(2), 62–76.
Ibrahim, A., Sirajo, A., & Ibrahim, A. (2022). The effects of delay and time management in building construction: A review. International Journal of Scientific Advances. https://doi.org/10.51542/ijscia.v3i4.29
Jabbar, A. L., & Khoiry, M. A. (2025). Construction delays and project profitability: A systematic review. Proceedings of the Institution of Civil Engineers – Management, Procurement and Law, 1–18.
Jiang, X., Lu, K., Xia, B., Liu, Y., & Cui, C. (2019). Identifying significant risks and analyzing risk relationships for construction PPP projects in China using the integrated FISM–MICMAC approach. Sustainability, 11. https://doi.org/10.3390/su11195206
Kebede, S. (2022). Assessment of causes and settlement mechanisms of construction disputes in public work contracts: An Ethiopian perspective. Archives of Civil Engineering, 145–168.
Kurniawan, M. A. D., Susanto, S., & Rahmawati, F. (2025). Occupational health and safety risk analysis using AS/NZS 4360:2004 and HIRARC methods in construction projects. Jurnal Konstruksi, 23, 37–45. https://doi.org/10.33364/konstruksi/v.23-2.2552
Nazali, W., Ngudiyono, & Mahendra, M. (2025). Risk management for implementing housing project development in West Lombok Regency. In Springer Nature (pp. 379–387). https://doi.org/10.1007/978-981-96-4694-4_38
Raodah, P. (2023). The public participation and sustainable development perspective on zero waste policy in Mataram City, NTB Province. Unram Law Review, 7(2).
Suryaningrat, L. R., Hasanah, S., Jiwantara, F. A., & Septyanun, N. (2025). Analysis of the implementation of public services in an electronic-based government system (Mataram City study). International Journal of Health, Economics, and Social Sciences (IJHESS), 7(3), 1643–1648.
Sutarna, I. T., Hakim, A., & Hendriadi, H. (2025). Improving governance and inclusion public services in Selaparang District, Mataram City. Journal of Governance and Local Politics (JGLP), 7(2), 245–252.
Yousri, E., Sayed, A., Farag, M., & Abdelalim, A. (2023). Risk identification of building construction projects in Egypt. Buildings, 13(4), 1084. https://doi.org/10.3390/buildings13041084
Zhasmukhambetova, A., Evdorides, H., & Davies, R. (2025). Integrating risk assessment and scheduling in highway construction: A systematic review of techniques, challenges, and hybrid methodologies. Future Transportation. https://doi.org/10.3390/futuretransp5030
Copyright (c) 2026 Anang Aprillah, Ngudiyono Ngudiyono, Made Mahendra

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.