Risk Management in Redesigning Main Dam for the Tiu Suntuk Dam Implementation
Downloads
The redesign of the Tiu Spara Dam main dam was carried out in response to changes in technical conditions and operational needs of the project, but this process has the potential to pose various risks that can affect the stability, safety, and performance of the dam. This study aims to identify risk indicators, analyze risk levels and priorities, and formulate risk control strategies in the redesign of the Tiu Suntuk Dam main dam. The method used is a descriptive quantitative approach based on ISO 31000:2018 risk management, with data collection through field observations, interviews, literature studies, and questionnaire dissemination to experienced respondents. Risk analysis was conducted using the Severity Index method to assess the probability and impact of the risk, which was subsequently mapped into a risk matrix. The results showed that the highest risk came from the technical aspects, namely changes in soil carrying capacity, availability of materials for new designs, and suitability of dam design with actual slope conditions, all of which fall under the category of extreme risk. Therefore, it is necessary to strengthen technical investigations, design adjustments, improve work quality control, and implement systematic and integrated risk management. This research is expected to be a reference in risk management in similar dam projects to improve structural safety and the sustainability of dam functions.
Adi, R. (2023). Analisis Risiko Keselamatan Kerja pada Proyek Konstruksi di Indonesia. Jakarta: Penerbit Teknik Konstruksi.
Alkhawaja, A., & Varouqa, A. (2023). Risk management in large construction projects: A systematic approach. International Journal of Construction Management, 23(2), 145–158.
Hermawan, R., & Susanto, D. (2022). Analisis risiko geoteknik pada proyek bendungan urugan. Jurnal Sumber Daya Air, 18(3), 201–212.
Marwanto, B., & Widodo, T. (2023). Pengaruh perubahan desain terhadap kinerja proyek bendungan. Jurnal Manajemen Konstruksi, 12(1), 33–44.
Misra, S. (2020). Risk Management in Construction Projects. New Delhi: McGraw-Hill Education.
Muhiddin, A. (2025). Analisis risiko operasional pada infrastruktur sumber daya air. Jurnal Teknik Pengairan, 21(1), 1–12.
Nirwono, J., & Soetomo, S. (2020). Bendungan dan ketahanan air wilayah kering Indonesia. Jurnal Perencanaan Wilayah, 15(2), 101–112.
Pamungkas, R., Hidayat, M., & Santoso, B. (2023). Penilaian risiko keamanan bendungan berbasis regulasi nasional. Jurnal Infrastruktur, 11(1), 19–30.
Putera, R., Hadi, S., & Yansen, R. (2019). Identifikasi risiko teknis pada proyek bendungan urugan. Jurnal Rekayasa Sipil, 9(2), 75–86.
Rahman, F. (2024). Dampak perubahan desain terhadap risiko konstruksi proyek bendungan. Jurnal Teknik Sipil Terapan, 14(1), 55–66.
Satrio, A. (2024). Penilaian risiko keamanan bendungan menggunakan metode Andersen pada Bendungan Haekrit. Jurnal Teknik Sumber Daya Air, 10(1), 41–52.
Septianugraha, D., Prabowo, A., & Lestari, S. (2024). Analisis manajemen risiko konstruksi pada proyek bendungan berdasarkan konsep ISO 31000:2018. Jurnal Teknik Sipil, 31(1), 1–14.
Sriharyati, L., Putri, D., & Anwar, R. (2024). Analisis manajemen risiko rencana pembangunan Bendungan Pelosika Kabupaten Konawe. Jurnal Teknik Sipil dan Lingkungan, 19(2), 120–132.
Sugiyono. (2013). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta.
Sugiyono. (2020). Metode Penelitian Kuantitatif. Bandung: Alfabeta.
Sutrisno, E. (2023). Analisis risiko cuaca ekstrem pada proyek bendungan. Jurnal Klimatologi Terapan, 7(1), 45–56.
Terfiana, A., Malik, R., & Hasan, F. (2024). Manajemen risiko keamanan, keselamatan, kesehatan, dan keberlanjutan kerja (K4) pada proyek jalan. Jurnal Konstruksi, 16(2), 88–99.
Tinambunan, R. (2024). Manajemen risiko dalam proyek konstruksi: Evaluasi dan pengembangan model. Jurnal Manajemen Proyek, 8(1), 1–15.
Wibowo, H. (2023). Analisis kegagalan material pada konstruksi bendungan. Jurnal Material Konstruksi, 5(2), 60–70.
Yoyo, A., Kurniawan, D., & Prasetyo, H. (2023). Analisis risiko pelaksanaan pembangunan Jembatan Waborobo – Batu Popi Kota Bau-Bau. Jurnal Teknik Sipil, 29(3), 211–223.
Yuliana, S. (2017). Risiko keselamatan kerja pada proyek konstruksi besar. Jurnal Keselamatan Konstruksi, 4(1), 12–22.
Zhang, L. (2019). Hydraulic Structures and Dam Engineering. Beijing: China Water Power Press.
Copyright (c) 2026 Aisyah Nur Amalina Lestari, Endah Kurniyaningrum, Silia Yuslim

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.









