Evaluation Of Cost And Time Performance Control Using The Concept Method Of Earned Value In The Purwodadi Market Development Project, Argamakmur District, North Bengkulu Regency
DOI:
https://doi.org/10.59188/eduvest.v4i11.49920Keywords:
Earned Value Management, project performance, cost performance index, time performance index, project evaluationAbstract
Construction projects often face challenges in maintaining a balance between execution and planning, especially in terms of time and cost. Delays and cost overruns often hinder project efficiency, which has an impact on the satisfaction of the project owner. This study aims to evaluate the cost and time performance of the Purwodadi Market development project in North Bengkulu Regency using the Earned Value Management (EVM) approach. The EVM method was chosen because of its ability to provide a comprehensive picture of the achievement of project performance in terms of time and cost. Data is obtained from the project's weekly report and analyzed using indicators such as Actual Cost of Work Performed (ACWP), Budgeted Cost of Work Scheduled (BCWS), and Budgeted Cost of Work Performed (BCWP). The results show that in the 9th month, the project achieved faster progress than scheduled with a Schedule Performance Index (SPI) of 1.068 and a Cost Performance Index (CPI) of 1.012. This shows that the project is running more efficiently in terms of time and more cost-effective compared to the planned budget. However, there are several months before (the 5th to 8th month) that show delays and wasted costs. The conclusion of this study is that the EVM method is effective in evaluating project performance and allows for the identification of areas that need improvement. Thus, the application of EVM is recommended to improve the management efficiency of similar construction projects.
References
Aditama, R. (2021). Analisis Biaya Dan Waktu Menggunakan Metode EVM (Earned Value Method) Pada Proyek Konstruksi (Studi Kasus Pada Proyek Pembangunan Gedung Laundry RSUD Sidaorjo). Universitas 17 Agustus 1945 Surabaya.
Apriansyah, A., Bachmid, S., Watono, W., & Abd Muin, S. (2022). Pengendalian Biaya Dan Waktu Dengan Metode Earned Value Pada Proyek Penyelesaian Gedung Sudirman Office Kecamatan Ujung Pandang Kota Makassar. Jurnal Teknik Sipil MACCA, 7(2), 128–137.
Ervianto, W. I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi.
Khairunnisa, N., Widayati, R., & Jamal, M. (2020). Analisis Pengendalian Biaya Dan Waktu Terhadap Proyek Konstruksi Dengan Metode Earned Value (Studi Kasus: Proyek Perumahan Penajam Paser Utara). Teknologi Sipil: Jurnal Ilmu Pengetahuan Dan Teknologi, 4(1), 9–19.
Mahapatni, I. A. P. S. (2019). Metode Perencanaan Dan Pengendalian Proyek Konstruksi. Unhi Press.
Manobe, R. E. Y. (2011). Analisis Koefisien Pekerja Pada Harga Satuan Pekerjaan Pembesian Di Yogyakarta. UAJY.
Mulyana, A., Susilawati, E., Putranto, A. H., Arfianty, A., Muangsal, M., Supyan, I. S., Kurniawan, R., Harahap, L. R., & Soegiarto, D. (2023). Manajemen Keuangan. Penerbit Widina.
Nasrul, H. S. (2018). PENGENDALIAN PROYEK DITINJAU DARI SISI WAKTU DAN BIAYA (Studi Kasus: Proyek Pembangunan Embung Tanjung Durian, Kecamatan Ranah Pesisir, Kabupaten Pesisir Selatan). Menara Ilmu: Jurnal Penelitian Dan Kajian Ilmiah, 12(10).
Pohan, A. H., Indriasari, I., & Bangun, S. (2022). Metode Pelaksanaan Pekerjaan Konstruksi Struktur Bawah Pada Perkantoran Danayasa Tower. Jurnal Teknik, 11(1).
Septiawan, L., & Thohir, M. (2006). Optimasi Alat Berat Pada Pekerjaan Galian Basement Dengan Metode Linier Programming (Studi Kasus Proyek Gedung Ditjen Dikti Jakarta Pusat). F. TEKNIK UNDIP.
Sianturi, N., Modifa, I., Nizar, A., Sihombing, R., & Simarmata, K. D. (2023). Analisis Manajemen Waktu Konstruksi Pada Proyek Pembangunan Dua Gedung Nurse Station COVID-19 RS. Djasamen Kota Pematang Siantar. Jurnal Santeksipil, 4(1), 7–14.
Sofwan Hadi, M. T. (2020). Manajemen Konstruksi (Proyek Jalan Dan Jembatan). Deepublish.
Susanto, H. (2018). Pengendalian Proyek Ditinjau Dari Sisi Waktu Dan Biaya Pada Proyek Pembangunan Embung Tanjung Durian Di Kabupaten Pesisir Selatan.
Syarif, M. A. (2018). Analisis Pengendalian Proyek Dari Segi Biaya Dan Waktu Menggunakan Metode Konsep Nilai Hasil (Project Control Analysis Of Cost And Time By Using Earned Value Method)(Studi Kasus Proyek Pembangunan Jembatan Dusun Mahia, Kelurahan Urimessing, Kecamatan Nusaniwe, Kota Ambon, Provinsi Maluku).
WIJAYA, F. A. (2022). Analisis Produktivitas Tenaga Kerja Konstruksi Pada Pekerjaan Pemasangan Keramik Menggunakan Mpdm (Method Productivity Delay Model)(Studi Kasus Proyek Pembangunan Masjid Muhammadyah Boarding School Kabupaten Lombok Barat, Narmada, Ntb).
Published
Issue
Section
License
Copyright (c) 2024 Muhammad Anwar, Endah Kurniyaningrum, Darmawan Pontan, Innavona
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.