The Influence of Team Game Tournament (TGT) Model on The Learning Outcomes of Grade 4 Students In Malaka Sari 01 Elementary School

Authors

  • Dea Ramadillah Fakultas Keguruan Dan Ilmu Pendidikan, Universitas Muhammadiyah Prof. Dr. Hamka, Indonesia
  • Ika Yatri Fakultas Keguruan Dan Ilmu Pendidikan, Universitas Muhammadiyah Prof. Dr. Hamka, Indonesia

DOI:

https://doi.org/10.59188/eduvest.v4i12.1589

Keywords:

Team Game Tournament (TGT), Elementary Education, Experimental Research, Educational Innovation

Abstract

This study explores the effect of the Team Game Tournament (TGT) learning model on the learning outcomes of Grade 4 students at Malaka Sari 01 Elementary School. The TGT model, as a cooperative learning strategy, engages students in collaborative and competitive group activities aimed at enhancing cognitive, affective, and psychomotor domains. The research employs a quasi-experimental design involving 60 students, divided into experimental and control groups. Data was collected through pre-tests and post-tests, with statistical analysis conducted using SPSS 25 to evaluate normality, homogeneity, and t-tests. The findings reveal a significant improvement in the learning outcomes of students exposed to the TGT model, with the experimental group demonstrating higher post-test scores compared to the control group. The study concludes that the TGT model fosters active participation, teamwork, and engagement, leading to improved academic performance and better comprehension of IPAS (Natural and Social Sciences) subjects. The results underscore the potential of TGT as an effective pedagogical tool to create enjoyable and meaningful learning experiences for elementary students.

References

Amani, N., M., A. N., & Samat, R. a. (2012). Infrastructure Component Assessment Using the Condition Index System: Literature Review and Discussion. KICEM Journal of Construction Engineering and Project Management. https://doi.org/10.6106/JCEPM.2012.2.1.027

American Public Transit Association, Glossary of Transit Terminology, American Public Transit Association, Washington DC, USA, 1994.

Anggraini, I. A. (2021). Dam Condition Assessment and Maintenance Cost Optimization Based on Life Cycle Cost Analysis. University of Indonesia.

Arliansyah, J., Kadarsa, E., & Melania, R. (2022). Noise Barrier Design of Palembang Light Rail Transit (Lrt) to Reduce Noise Level. Applied Research and Policy Publication, 5(2). https://doi.org/10.46774/pptk.v5i2.504.

Boomen, M. V. D., Schoenmaker, R., & Wolfert, A. R. M. (2018). A Life Cycle Costing Approach for Discounting in Age and Interval Replacement Optimization Models for Civil Infrastructure Assets. Structure and Infrastructure Engineering, 14.

Chang, D.-Y. (1996). Applications of The Extent Analysis Method on Fuzzy AHP. European Journal of Operational Research, 65. https://doi.org/10.1016/0377-2217(95)00300-2.

Corder, Antony. 1996. Maintenance Management Techniques. Jakarta: Erlangga.

D. Bruckmann, A. Bomhauer-Beins, and U. Weidmann, "A qualitative model to evaluate the financial effects of innovations in the rail sector," Transportation Research Procedia, vol. 10, pp. 564-573, 2015.

Dananjoyo, R. A., Aminullah, A., Nugroho, A. S. B. (2020). Application of the Life Cycle Cost Method in Calculating the Economic Evaluation of Bridges for Prioritizing Bridge Handling.

El-Akruti, K., Zhang, T., Dwight, R. (2016). Developing an Optimum Maintenance Policy by Life Cycle Cost Analysis - a Case Study.

Fuller, S., 2010. Life-cycle Cost Analysis (LCCA). Whole Building Design Guide.

Giunta, M., Bressi, S., & D'Angelo, G. (2018). Life cycle cost assessment of bitumen stabilized ballast: A novel maintenance strategy for railway track-beds. Construction and Building Materials, 172, 751-759. doi:10.1016/j.conbuildmat.2018.04.020.

Goh, K. C., Goh, H. H., Chong, H. (2018). Integration Model of Fuzzy AHP and Life-Cycle Cost Analysis for Evaluating Highway Infrastructure Investments.

Heralova, R. S. (2017). Life Cycle Costing as an Important Contribution to Feasibility Study in Construction Projects. Procedia Engineering, 196.

Heralova, R. S. (2014). Life Cycle Cost Optimization Within Decision Making on Alternative Designs of Public Buildings. Procedia Engineering, 85, 454463. https://doi.org/10.1016/j.proeng.2014.10.572

Huang, M., Dong, Q., Ni, F., Wang, L. (2020). LCA and LCCA based multi-objective optimization of pavement maintenance.

Herdian, Rozi. (2019). Development of Palembang Light Rail Transit (LRT) Site Based on Analytical Customer Relationship Management (CRM). Sriwijaya University. Palembang.

Hudoyo, C. P. (2018). Development of a Risk-Based WBS Standard to Improve Cost Estimation Planning in Sea Port Construction Projects. University of Indonesia.

Illankoon, I. M. C. S., Tam, V. W. Y., Le, K. N., & Wang, J. Y. (2018). Life Cycle Costing for Obtaining Concrete Credits in Green Star Rating System in Australia. Journal of Cleaner Production, 172. https://doi.org/10.1016/j.jclepro.2017.11.202

J. Liang and Z. Liu, "Analysis of urban rail transit operation cost control," International Journal of Business and Social Science, vol. 5, no. 5, pp. 140-142, 2014.

Ministry of National Development Planning/Bappenas. (2015). Draft Final Business Case/Feasibility Study Report Preparation of Transaction Documents for South Sumatra Monorail Public-Private Partnership Project.

Margaretha, T. N. (2023). Evaluation of Light Rail Transit Service Performance in Palembang City. Islamic University of Indonesia.

Marliansyah, J. (2014). Life Cycle Cost Plan Analysis of Hostel Building in Jimbun Medika Kediri Hospital Area.

Muda, D. (2021). Analysis of the Effect of Safety, Comfort, and Accessibility on Public Interest in Using Mrt Jakarta. Inter-university Transportation Studies Forum, 1(2), 4-6.

Pambudi, A. S., & Hidayati, S. (2020). Social Behavior Analysis of Urban Transportation Mode Users: Case Study of DKI Jakarta Mass Rapid Transit (MRT). Bappenas Working Papers, 3(2), 143-156. https://doi.org/10.47266/bwp.v3i2.74.

Pangestu, Y. (2015). Selection of Racket Handle Wood Raw Material Suppliers Using Fuzzy Analitycal Hierarchy Process Method. Journal of Industrial Engineering, Vol. 16, No. 1, February 2015, pp. 31-42. ISSN 1978-1431 print / ISSN 2527-4112 online

Perwitasari, D., Rahman, H. Z., Petroceany, J. S., Andreas, A. (2017). Optimization of Asset Utilization Cooperation in Financing Operations and Maintenance of Palmerah Station.

Plebankiewicz, E., Meszek, W., Zima, K., Wieczorek, D. (2019). Probabilistic and Fuzzy Approaches for Estimating the Life Cycle Costs of Buildings under Conditions of Exposure to Risk.

Putri, Dianyta. (2019). Factors Affecting Public Interest in Using Light Rail Transit (LRT) Transportation in Palembang. Sriwijaya University. Palembang

Rosyad, F., & Yandi, J. (2019). Analysis of Perceptions of Palembang City LRT Service Users. Tekno, 16(1), 421-435.

Saaty, T. L. (1993). Decision Making for Leaders: An Analytic Hierarchy Process for Decision Making in Complex Situations. Pustaka Binaan Pressindo.

Setiono, Koosdaryani, Suryoto, & Ulyanisa, N. (2020). Public Taste in Determining Housing in Sukoharjo Regency with the Fuzzy AHP Method. e-Journal of Civil Engineering Matrix, 8. https://doi/org/10.20961/mateksi.v8i2.44178

Sitohang, D. T. R. T. (2018). Development of WBS Standards to Improve Scheduling Planning in Risk-Based Air Port Construction Projects.

Spickova, M., & Myskova, R. (2015). Costs Efficiency Evaluation using Life Cycle Costing as Strategic method. Procedia Economics and Finance 34.

Sugiyono. (2013). Quantitative, Qualitative, and R&D Research Methods. Alfabeta

Sun, Y., Carmichael, D. G. (2017). Uncertainties Related to Financial Variables Within Infrastructure Life Cycle Costing: a Literature Review.

Taufik & Arliandi, M. (2020). Palembang City Lrt E-Ticketing Information System. Bina Darma Conference on Computer Science. e-ISSN: 2685-2683p-ISSN: 2685-2675.

V. R. Vuchic, Transportation Engineering and Planning, EOLSS Publisher/UNESCO, Oxford, UK, 2009.

Wayangkau, H. G. (2021). Risk Management Analysis on Dam Construction Projects (Case Study: Titab Dam in Bali, Jatibarang Dam in Semarang Regency and Diponegoro Dam in Semarang). Diponegoro University. Semarang.

Wongkar, Y.K., Tjakra, J., Pratasis, P. A. K. (2016). Life Cycle Cost Analysis on Building Construction (Case Study: St. URSULA School Kotamobagu).

Y. Zhu and M. Diao, "The impacts of urban mass rapid transit lines on the density and mobility of high-income households: a case study of Singapore," Transport Policy, vol. 51, pp. 70-80, 2016.

Yahya, I. N. (2011). Risk Management of 10,000 MW PLTU Development Project in order to Improve Cost Performance. April.

Zhou, Q., Mao, B., Peng, S., Huang, J., Tian, P. (2023). Analysis of the Impacts of Passenger Demand on the Profitability of Different Types of Urban Rail Transit. Promet - Traffic & Transportation. 2023;35(1):71-86. https://doi.org/10.7307/ptt.v35i1.4185.

Downloads

Published

2024-12-24