This study aims to determine the optimal alternative route for the Pluit–Airport Toll Road based on technical evaluation and investment feasibility analysis. The research was motivated by the high level of congestion on the Prof. Dr. Ir. Sedyatmo Toll Road, which serves as the primary access route to Soekarno–Hatta International Airport, creating the need for an alternative corridor capable of improving connectivity, reducing travel time, and supporting the development of the urban toll road network. The research employed a descriptive quantitative approach using Multi-Criteria Decision Making (MCDM) to assess six alternative routes. The technical evaluation was conducted by examining road geometric design, structural requirements, geotechnical conditions, hydrology, route length, construction costs, road network integration, constructability, land acquisition risks, and environmental and social impacts. The selected alternative was further assessed through investment feasibility indicators, including Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP), along with sensitivity analysis. The technical analysis results showed that Alternative Route 4A achieved the highest technical score because it provided an optimal route alignment, more efficient structural requirements, lower land acquisition risks, better constructability, and superior connectivity with the Harbour Road II Toll Road and Sedyatmo Toll Road. Therefore, the construction of the Pluit–Airport Toll Road was considered feasible from both technical and financial perspectives and was expected to improve transportation connectivity and efficiency in the Jakarta metropolitan area.
Adi Satria, F. (2017). Financial feasibility study of the Mojokerto-Kertosono Toll Road Section 3.
Adwitiya, T. (2021). Pandaan-Malang Toll Road Investment Evaluation Study.
Andrea, K., & Ahyudanari, E. (2018). Financial feasibility of New Yogyakarta International Airport trains with sensitivity analysis to changes in land needs.
Arin, S. R. (2017). The route selection model between the toll road and the Ngawi-Kertosono national road uses the diversion curve method.
Christy Elisha, L. (2020). Cost benefit analysis (CBA) of the infrastructure development of the Semarang-Solo Toll Road.
Erza, O., & Franita, N. (2018). Cost and benefit analysis of road infrastructure development in the capital city of DKI Jakarta and its supporting areas.
Handayani, D., Amirotul, M. H. M., & Primasari, R. A. (2019). Analysis of the variables of the selection of toll roads in the Bawen-Salati ga segment.
Hanumsari, & Widyastuti. (2015). Feasibility Study on the Construction of the Ngawi-Kertosono Toll Road.
Justitia, R., Farhan, L. M., Djakfar, L., & Bowoputro, H. (2020). Analysis of the planning of the Gempol-Mojokerto Toll Road.
Krisnananda, J., & Kartika, A. A. G. (2021). Analysis of the economic and financial feasibility of the construction of the Mengwi-Gilimanuk Toll Road.
Kurniadi, Y. (2020). Investment feasibility study on the Pekanbaru-Dumai Toll Road project.
Law of the Republic of Indonesia Number 38 of 2004 concerning Roads. (2004). State Secretariat.
Noviastuti, D. (2023). Analysis of the financial feasibility of the Government and Business Entity Cooperation (PPP) investment project for toll road infrastructure.
Stiglitz, J. (2000). Economics of the Public Sector. W.W. Norton & Company.
Sukirman, S. (1999). Geometric Planning of Highways. Nova.
Suroso, E. (2015). The Impact of Infrastructure on National Economic Growth. Ministry of Public Works and Public Housing.
Vikannanda, I. M. (2017). Analysis of the economic feasibility of the development of the Gresik West Ring Road.
Wahyudia, R., & Nahdalina. (2019). Analysis of the feasibility of toll road investment due to the risk of project delays and traffic prediction errors.
Wibowo, & Tiara, D. A. (2019). The trase planning for the construction of the Kertosono-Kediri Toll Road is reviewed from the economic and financial feasibility.
Zulfiqar. (2019). Analysis of the selection of coal mine transportation road routes using the fuzzy analytic hierarchy process method.
Copyright (c) 2026 Dzaky Rizaldi, Hermanto Dwiatmoko, Muhammad Isradi

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.