Analysis for Selecting the Operation and Maintenance (O&M) Scheme to Improve Pltmg Performance: A Case Study of PT PLN (Persero)
Downloads
Gas engine power plants (Pembangkit Listrik Tenaga Mesin Gas / PLTMG) play a critical role in maintaining electricity supply in Indonesia’s small and isolated power systems. However, several units continue to experience low availability and significant operational losses under different operation and maintenance (O&M) arrangements. This study aimed to identify the main causes of PLTMG O&M performance gaps, determine appropriate evaluation criteria, and select the most suitable O&M scheme to improve performance. A mixed-method case study was conducted using operational data from 18 PLTMG units during 2025–June 2026, supported by interviews, focus group discussions, and expert assessments. The analysis integrated Overall Equipment Effectiveness (OEE), Pareto analysis, Current Reality Tree, Value-Focused Thinking, and the Analytic Hierarchy Process (AHP). The results showed that aggregate availability reached 89.67% for Mandiri O&M, 93.15% for Mandiri O&M with Long-Term Service Agreement (LTSA), and 96.84% for Sharing O&M. Maintenance Outage contributed 61.65% of total equivalent loss hours, primarily due to limited technical support, spare-parts readiness, knowledge transfer constraints, and incompatibility between operational needs and the selected O&M model. The AHP results ranked Sharing O&M as the highest-priority scheme with a weight of 69.56%, followed by LTSA at 23.59% and Mandiri O&M at 6.81%. Therefore, Sharing O&M was recommended for a controlled pilot implementation at PLTMG Bima and Langgur before broader adoption. The pilot implementation should be monitored using reliability, cost-efficiency, and organizational capability indicators.
Ackermann, F., & Eden, C. (2011). Strategic management of stakeholders: Theory and practice.
Dettmer, H. W. (1997). Goldratt's theory of constraints: A systems approach to continuous improvement.
Firstantara, D., et al. (2025).
Fluitman, K. S., Van Galen, L. S., Merten, H., Rombach, S. M., Brabrand, M., Cooksley, T., Nickel, C. H., Subbe, C. P., Kramer, M. H. H., & Nanayakkara, P. W. B. (2016). Exploring the preventable causes of unplanned readmissions using root cause analysis: Coordination of care is the weakest link. European Journal of Internal Medicine, 30, 18–24.
Haqqi, I., Sucipto, P. A., & Prasetyo, S. D. (2026). Outage management and reliability analysis of gas engine units in an isolated power system: A case study of PLTMG Bawean. Future Energy and Environment Letters, 7(1), 8–22.
Machfudiyanto, R. A., Humang, W. P., Wahjuningsih, N., Kamil, I., & Putra, Y. Y. A. (2023). Probability of risk factors affecting small-scale LNG supply chain activities in the Indonesian archipelago. Infrastructures, 8(4), 74.
Manurung, T., & Putro, U. S. (2024).
Mu, E., & Pereyra-Rojas, M. (2018). Practical decision making using Super Decisions v3: An introduction to the Analytic Hierarchy Process.
Nusraningrum, D., & Arifin, M. Z. (2018).
Pietsch, D., Matthes, M., Wieland, U., Ihlenfeldt, S., & Munkelt, T. (2024). Root cause analysis in industrial manufacturing: A scoping review of current research, challenges and the promises of AI-driven approaches. Journal of Manufacturing and Materials Processing, 8(6), 277.
Pramono, E. Y., Rommyonegge, A., Anggoro, B., Banjar-Nahor, K. M., & Hariyanto, N. (2024). The assessment of Batam-Bintan power grid vulnerability risk regarding intentional transmission attacks. 2024 International Conference on Technology and Policy in Energy and Electric Power (ICTPEP), 52–56.
PT PLN (Persero). (2013). Board of Directors Regulation No. 0779.K/DIR/2013 concerning the Overall Equipment Effectiveness (OEE) calculation methodology.
Rahman, A., et al. (2023).
Saaty, T. L. (1980). The analytic hierarchy process: Planning, priority setting, resource allocation.
Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences.
Silitonga, S. H., Habib, M., Indrayanto, E. Y., Barus, E. P., Kurniawan, A., & Sukristiono, C. H. U. (n.d.). Lesson learned from a forced outage on April 14, 2024: Improving system reliability in power generation plants by eliminating nuisance trip due to improper setting of motor protection—A case study of geothermal power plant.
Soldani, J., & Brogi, A. (2022). Anomaly detection and failure root cause analysis in (micro)service-based cloud applications: A survey. ACM Computing Surveys (CSUR), 55(3), 1–39.
Tayal, A., et al. (2021).
Umardi, Z., Aryani, N. K., & Mardiyanto, R. (2026). Impact of subsystem reconfiguration on reliability and generation cost: A case study of the Sumatera power system. 2026 International Seminar on Intelligent Technology and Its Applications (ISITIA), 1018–1023.
Van Galen, L. S., Struik, P. W., Driesen, B. E. J. M., Merten, H., Ludikhuize, J., Van Der Spoel, J. I., Kramer, M. H. H., & Nanayakkara, P. W. B. (2016). Delayed recognition of deterioration of patients in general wards is mostly caused by human related monitoring failures: A root cause analysis of unplanned ICU admissions. PLOS ONE, 11(8), e0161393.
Wijaya, F. A., & Indianto, M. A. (n.d.). Techno-enviro-economic approach for electrification of rural and shrimp farming regional development of an isolated island in Indonesia by utilizing hybrid renewable energy systems. Journal of Materials Exploration and Findings, 4(2), 4.
Yunusa-Kaltungo, A., Kermani, M. M., & Labib, A. (2017). Investigation of critical failures using root cause analysis methods: Case study of ASH cement PLC. Engineering Failure Analysis, 73, 25–45.
Copyright (c) 2026 Bagus Efendi, Akbar Adhi Utama

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.