Analysis of the Effects of Work Method Selection and Monitoring of Work Execution on Construction Time and Cost Risks in Highway Projects
Downloads
This research aims to analyze the effect of work method selection and work implementation monitoring on time and cost risks in toll road construction projects in Banten Province. Toll road construction projects have a high level of complexity and frequently face various problems, such as project delays, cost overruns, limited resources, and weak project supervision systems. These conditions underscore the importance of implementing appropriate work methods and effective project monitoring to minimize risks during construction activities. This study employed a quantitative approach using the Structural Equation Modeling–Partial Least Squares (SEM-PLS) method. Data were collected through questionnaires distributed to 54 respondents consisting of contractors, supervisory consultants, and project management personnel involved in toll road projects in Banten Province. Data analysis was conducted using SmartPLS 4 software through outer model and inner model testing. The results show that work methods have a negative and significant effect on both time risk and cost risk. Furthermore, project monitoring also has a negative and significant effect on both time risk and construction cost risk. The findings indicate that the better the implementation of work methods and project monitoring, the lower the risks of project delays and cost overruns. This study is expected to serve as a reference for contractors, consultants, and project owners in improving the effectiveness of toll road construction project management, particularly in controlling project time and costs.
Anindito, D. B., Ramadhani, A. K., Hidayati, I., Siagian, A. T. T., & Iskandar, D. A. (2025). The Long and Winding Road of Urban Growth: The Case of Small Cities along Trans-Java Toll Road. Urban Policy and Research, 1–18.
Al Amri, T., & Marey-Pérez, M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, 5(2), 87–102. https://doi.org/10.5267/j.jpm.2020.1.001
Anindito, D. B., Ramadhani, A. K., Hidayati, I., Siagian, A. T. T., & Iskandar, D. A. (2025). The long and winding road of urban growth: The case of small cities along Trans-Java toll road. Urban Policy and Research, 1–18.
Basri, B., Badaruddin, B., Kusmanto, H., & Ridho, H. (2024). Strategic initiatives of the Kampar Regency government in optimizing the Trans-Sumatra toll road to improve the socio-economic welfare of the community. Proceeding Medan International Conference on Economic and Business, 2, 2104–2113.
Bénichou, W. (2023). Sustainable development of transport infrastructure in the system of national economy. Journal of Economics, Innovative Management and Entrepreneurship, 1(1).
Buchori, I., Zaki, A., Sejati, A. W., Pangi, P., Pramitasari, A., & Basuki, Y. (2023). Toll road construction and its impact on paddy fields, production and the regional development of the Semarang–Surakarta corridor, Indonesia. In Geospatial Science for Smart Land Management (pp. 376–397). CRC Press.
Ferrada, X., & Serpell, A. (2014). Selection of construction methods for construction projects: A knowledge problem. Journal of Construction Engineering and Management, 140(4), 1–7. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000715
Flory, O. O., & Nyaronga, G. J. (2025). Enhancing economic growth through transport corridors: A study of the Central Corridor Transit Transport Facilitation Agency. African Development Finance Journal, 9(1), 18–39.
Guo, J., Huang, X., Dou, L., Yan, M., Shen, T., Tang, W., & Li, J. (2022). Aging and aging-related diseases: From molecular mechanisms to interventions and treatments. Signal Transduction and Targeted Therapy, 7(1), 391.
Hoque, I., Mia, A., Sharif, M. I., & Uddin, M. N. (2024). The impact of triple constraints on project success: A moderating role of organizational support. Engineering, Construction and Architectural Management, 31(3), 1198–1218. https://doi.org/10.1108/ECAM-07-2022-0664
Issa, U. H., Miky, Y. H., & Abdel-Malak, F. F. (2020). A decision-making framework for time–cost–quality trade-off in construction projects. Structures, 27, 361–370. https://doi.org/10.1016/j.istruc.2020.05.043
Jaselskis, E. J., & Russell, J. S. (1993). Research methodology. Social Work Research and Abstracts, 29(4), 53–57. https://doi.org/10.1093/swra/29.4.53
la Torre, A., Lo Vecchio, F., & Greco, A. (2023). Epigenetic mechanisms of aging and aging-associated diseases. Cells, 12(8), 1163.
Lemanowicz, J., Kloska, S. M., Siwik-Ziomek, A., Kołaczyk, P., Lipińska, U. W., & Kloska, A. (2026). Biochemical mechanisms of cellular stress adaptation in the pathogenesis of chronic diseases. Molecules, 31(9), 1381.
Mpofu, C., Bekker, M. C., & Marnewick, C. (2024). Practices and techniques for construction projects cost control: A critical review. International Journal of Construction Management, 24(8), 525–552. https://doi.org/10.1080/16874048.2024.2337060
Noor, I., Mochtar, I. K., & Wiguna, I. P. A. (2023). Risk identification in toll road construction projects in Indonesia. IPTEK Journal of Proceedings Series, 1(1), 20–27. https://doi.org/10.12962/j23546026.y2023i1.15382
Nufah, H., Prasetyo, A., & Nugroho, T. (2024). Delay risk in Binjai–Pangkalan Brandan toll construction using Relative Importance Index. Civil Engineering and Sustainable Infrastructure Journal, 12(2), 102–115. https://doi.org/10.12962/j24433527.v12i2.20841
Oliveros-Romero, J., & Aibinu, A. A. (2023). Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: A toll road case. Built Environment Project and Asset Management, 13(4), 574–589. https://doi.org/10.1108/BEPAM-03-2022-0039
Osei-Kyei, R., Narbaev, T., & Ampratwum, G. (2022). A scientometric analysis of studies on risk management in construction projects. Buildings, 12(9), 1342. https://doi.org/10.3390/buildings12091342
Pacinella, G., Ciaccio, A. M., & Tuttolomondo, A. (2022). Endothelial dysfunction and chronic inflammation: The cornerstones of vascular alterations in age-related diseases. International Journal of Molecular Sciences, 23(24), 15722.
PMI. (2021). A guide to the project management body of knowledge (PMBOK® guide) (7th ed.). Project Management Institute.
Putri, D. A., Muhammaditya, A., & Arnanda, J. (2023). Hybrid policy model in the land acquisition decision-making process for toll road projects in West Sumatra, Indonesia. Academic Journal of Interdisciplinary Studies, 12(3), 250–265. https://doi.org/10.36941/ajis-2023-0075
Qamar, A., & Khan, M. B. (2024). Bridging gaps through connectivity: Evaluating multimodal transport networks in emerging economies. Journal of Regional Connectivity and Development, 3(2), 8–17.
Copyright (c) 2026 Damar Kurnia, Acep Hidayat , Mawardi Amin

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.