Influence of Internal and External Project Factors On the Performance of Road Construction Project Implementers in West Papua Province
DOI:
https://doi.org/10.59188/eduvest.v4i12.50092Keywords:
Internal Project Factors, External Project Factors, Performance, Road ConstructionAbstract
The development of road construction projects in West Papua Province is very important to support regional economic development. However, these projects often face challenges that can affect the performance of project implementers. This research aims to identify the influence of internal and external factors on the performance of road construction project implementers in the region. The research method used is a descriptive method with a quantitative approach, where data is collected through questionnaires distributed to project implementers. Data analysis was carried out using regression techniques to determine the relationship between the variables studied. The research results show that internal factors such as project team competency and risk management, as well as external factors such as weather conditions and government regulations, have a significant influence on the performance of project implementers. This research concludes that to improve the performance of road construction projects in West Papua, there needs to be an increase in aspects of internal competence and management as well as adaptation to unexpected external conditions.
References
Abushaban, S. S. (2008). Factors Affecting the Performance of Construction Projects in The Gaza Strip. Thesis, The Islamic University of Gaza, Construction Management, Palestine.
Andi. (2005). Faktor-Faktor Penyebab Rework Pada Pekerjaan Konstruksi. Civil Engineering Dimension.
Bowen, P., & Cattel, K. (2007). Perceptions of Time, Cost and Quality Management. The Australian Journal of Construction Economics and Building, Vol. 2.
Carr, R. I. (1998). Cost, Schedule and Time Variances and Integration. Journal of Construction Engineering and Management.
Choudhry, R., Nasir, A., & Gabriel, H. (2012). Cost and Time Overruns in Highway Projects in Pakistan. Pakistan Engineering Congress, Centenary Celebration Proceedings, 353-369.
Dolage, D., & Rathnamali, D. (2013). Causes of Time Overrun in Construction Phase of Building Projects. ENGINEER, Vol. XXXXVI, No. 03, 9-18.
Enshassi, A., Mohamed, S., & Abushaban, S. ( 2009). Factors Affecting The Performance of Construction Projects in The Gaza Strip. Journal of Civil Engineering and Management.
Fahirah, F. (2005). Identifikasi Penyebab Overrun Biaya Proyek Konstruksi Gedung. Smartek, Volume 3; No. 3, 160-168.
Hartono. (2011). Pengaruh Aspek Pelaksanaan Konstruksi Terhadap Biaya dan Waktu Proyek (Studi Kasus di Dinas Cipta Karya dan Tata Ruang Provinsi Jawa Tengah). Universitas Diponegoro Semarang, Semarang.
Heravitorbati, Amirhossein, Coffey, Vaughan, Trigunarsyah, Saghatforoush, B., & Ehsan. (2011). Examination of Process to Develop a Framework For Better Implementation of Quality Practices in Building Projects. 2nd International Conference on Construction and Project Management (ICCPM 2011).
Ibironke, & Timothy, O. (2012). Impact of Non-Implementation of Time, Cost, and Quality Management Procedures in The Nigerian Construction Industry. Journal of Building Performance, 3.
International Conference on Construction and Project Management, 15 (2011).
Ismail, I., Rahman, I. A., & Memon, A. H. (2013). Study of Factors causing Time and Cost Overrun Trroughout Life Cycle of Construction Project. Proceedings of Malaysian Technical Universities Conference on Engineering & Technology.
Jha, K., & Iyer, K. (2006). Critical Factor Affecting Quality Performance in Construction Projects. Total Quality Management, 17, No. 9, 1155-1170.
Jogiyanto, Willy Abdillah. (2009). Partial Least Square (PLS), Alternatif Structural Equation Modeling (SEM) dalam Penelitian Bisnis (Buku). Andi Yogyakarta.
Kamaruzzaman. (2012). Studi Keterlambatan Penyelesaian Proyek Konstruksi (Study of Delay in the Completion of Construction Projects). JURNAL TEKNIK SIPIL UNTAN, 175-190.
Kaming, P., Olomolaiye, P., Holt, G., & Harris, F. (1997). Factor Influencing Construction Time and Cost Overrun on High-Rise Projects in Indonesia. Construction Management and Economics.
Kiew, P. N., Ismail, S., & Yusof, A. M. (2013). Key Performance Indicators in Construction Quality Management System. The Second International Conference on Engineering Business Management 2013 (ICEBM 2013). Kuala Lumpur: Universiti Teknologi Malaysia Kuala Lumpur.
Mahamid, I. (2011). Causes of Constructions Failure : Contrator's View. 2nd
Mahamid, I. (2013). Frequency of Time Overrun Causes in Road Construction in Palestine : Contractor's View. Organization, Technology and Technology, An International Journal, 720-729.
Memon, A. H. (2014). Contractor Perspective On Time Overrun Factors in Malaysian Construction Projects. International Journal of Science, Environment and Technology.
Memon, A., Rahman, I., & Azis, A. (2012). Time and Cost Performance in Construction Projects in Southern and Central Regions of Penisular Malaysia. International Journal of Advances in Applied Sciences (IJAAS), Vol. 1, No. 1, 45-52.
Nguyen, A., & Chileshe, N. (2013). Revisiting of The Critical Factors Causing Dailure of Construction Projects in Vietnam. 929-938.
Omran, A., Abdalrahman, S., & Pakir, A. K. (2012). Project Performance in Sudan Construction Industry : A Case Study. Global Journal of Accounting and Economic Reseacrh.
Sambasivan, M., & Soon, Y. W. (2006). Causes and Effects of Delays in Malaysian Construction Industry . International Journal of Project Management .
Shanmugapriya, S., & Subramanian, D. (2013). Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects. International Journal of Emerging Technology and Advanced Engineering.
Sugiyono. (2012). Metode Penelitian Kuantitatif dan Kualitatif. PT. ALFABETA.
Takim, R., & Akintoye, A. (2002). Performance Indicators For Succesful Construction Project Performance. 18th Annual ARCOm Conference, 2, 545-555.
Vidalis, S., & Najafi, F. (2002). Cost and Time Overrun in Highway Construction. 4th Transportation Specialty Conference of the Canadian Society For Civil Engineering, 1-10.
Vyas, G. S., & Kulkarni, S. S. (2013). Performance Indicators for Construction Project. International Journal of Advanced Electrical and Electronics Engineering (IJAEEE).
Yates, J., & Lockley, E. (2002). Documenting and Analyzing Construction Failures. Journal of Construction Engineering and Management, 8-17.
Published
Issue
Section
License
Copyright (c) 2024 Marjianus Paulus Kioata Tawer, Dewi Ana Rusim, Harmonis Rante
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.