Risk Assessment Of Gonggang Dam In Magetan District, East Java Province

Authors

  • Trifad Mochammad Khaidir Fakultas Teknik, Universitas Diponegoro, Semarang, Indonesia
  • Sri Sangkawati Fakultas Teknik, Universitas Diponegoro, Semarang, Indonesia
  • Sriyana Fakultas Teknik, Universitas Diponegoro, Semarang, Indonesia

DOI:

https://doi.org/10.59188/eduvest.v4i11.44757

Keywords:

Gonggang Dam, Risk Assessment, Dam Safety, Event Tree Method, Traditional Method

Abstract

This study aims to assess the safety risk of the Gonggang Dam located in Magetan Regency, East Java, using traditional methods and the event tree method (Event Tree Analysis). The risk assessment is conducted by identifying potential hazards and failure modes, estimating the probability of failure, and evaluating the level of risk based on the analysis results. The results of the analysis show that the event tree method provides acceptable risk results, while the traditional method shows unacceptable risks. The priority of risk management at Gonggang Dam is focused on monitoring the dam body and inundation area to maintain safety and maximize the life of the dam. Recommendations were given to improve structural safety and regular monitoring.

References

Ditjen SDA. (2011). Pedoman Teknis Penilaian Risiko. Jakarta.

Bengawan Solo River Basin Center. (2017). Final Report of the Grand Inspection of Gonggang Dam.

Cristina Dwi Y, Juwono, P. T., & Yuliani, E. (2016). Gerokgak Dam Based on Event Tree Method. Journal of Irrigation Engineering, 7, 7-16.

Department of Public Works. (1995). Large Dams in Indonesia. Jakarta: Public Works Publishing Agency Foundation.

DG Natural Resources. (2011). Technical Guidelines for Risk Assessment.

Vaughan, E., & Elliot, C. M. (1978). Fundamentals of Risk and Insurance. Toronto:

John Wiley & Sons Inc.

AS/NZS 4360:2004 (1999). risk management. Standards australia, SAI Global Limited

Standards New Zealand

Kementerian PUPR. (2015). Peraturan Menteri PUPR No. 27/PRT/M/2015 tentang Bendungan. Jakarta: Kementerian PUPR.

Soentoro, Edy Anto, Purnomo, Arie Bayu, & Susantin, Sri Hetty. (2013). Study on Dam Risk Assessment as a Decision-Making Tool to Assist Prioritizing Maintenance of Embankment Dam in Indonesia. (November).

Downloads

Published

2024-11-20