1.
Raditya H, Budiarto R, Irnawan R. Optimization of PV-BESS System Capacity Considering Battery Degradation for Nighttime Peak Load Supply: A Case Study of Guluk-Guluk, Madura. Eduvest [Internet]. 2026Jul.8 [cited 2026Aug.26];6(7):8010-25. Available from: https://eduvest.greenvest.co.id/index.php/edv/article/view/53297