1.
Sugih Hartono R, Riyadi S, Barata FA. Analysis of Non-Physical Waste Production Variables (Lean Six Sigma) on Project Time Management Through the Mediation of Lean Construction. Eduvest [Internet]. 2025Dec.18 [cited 2026Feb.16];5(12):14901-14. Available from: https://eduvest.greenvest.co.id/index.php/edv/article/view/52560