1.
Fajar I, Zaki M, Pontan D, Widiarso T. Cost Analysis of Construction Using the Cost Significant Model and Artificial Neural Network or Feasibility Study Cost Estimation in Process Industry (Case Study: Feasibility Study Projects in the Process Industry Sector in Indonesia). Eduvest [Internet]. 2025Jul.14 [cited 2025Oct.20];5(7):9336-9343. Available from: https://eduvest.greenvest.co.id/index.php/edv/article/view/50381