Nur Soleh, I., and M. Suef. “Optimization of Preventive Replacement of Critical Components in the Komatsu PC2000-8 Excavator to Minimize Downtime at PT XYZ”. Eduvest - Journal of Universal Studies, vol. 6, no. 8, Aug. 2026, pp. 8712-29, doi:10.59188/eduvest.v6i8.53324.