Sugih Hartono, R., S. . Riyadi, and F. A. . Barata. “Analysis of Non-Physical Waste Production Variables (Lean Six Sigma) on Project Time Management Through the Mediation of Lean Construction”. Eduvest - Journal of Universal Studies, vol. 5, no. 12, Dec. 2025, pp. 14901-14, doi:10.59188/eduvest.v5i12.52560.