[1]
R. Sugih Hartono, S. . Riyadi, and F. A. . Barata, “Analysis of Non-Physical Waste Production Variables (Lean Six Sigma) on Project Time Management Through the Mediation of Lean Construction”, Eduvest, vol. 5, no. 12, pp. 14901–14914, Dec. 2025.