[1]
A. Sasmita, “Analysis of Road and Drainage Project Performance Control Using the Earned Value Method: A Case Study of Road and Drainage Work Row 46 Segment II Jakarta Garden City”, Eduvest, vol. 5, no. 11, pp. 13726–13744, Nov. 2025.