[1]
P. Z. Putra and A. A. . Utama, “Optimizing Pipeline Inspection Program To Balance Safety, Compliance, And Cost Efficiency: A Case Study At Petrotama”, Eduvest, vol. 5, no. 10, pp. 13027–13045, Oct. 2025.