Nur Soleh, I. and Suef, M. (2026) “Optimization of Preventive Replacement of Critical Components in the Komatsu PC2000-8 Excavator to Minimize Downtime at PT XYZ”, Eduvest - Journal of Universal Studies, 6(8), pp. 8712–8729. doi: 10.59188/eduvest.v6i8.53324.