Sugih Hartono, R., Riyadi, S. . and Barata, F. A. . (2025) “Analysis of Non-Physical Waste Production Variables (Lean Six Sigma) on Project Time Management Through the Mediation of Lean Construction”, Eduvest - Journal of Universal Studies, 5(12), pp. 14901–14914. doi: 10.59188/eduvest.v5i12.52560.