Fajar, I., Zaki, M. ., Pontan, D. . and Widiarso, T. (2025) “Cost Analysis of Construction Using the Cost Significant Model and Artificial Neural Network or Feasibility Study Cost Estimation in Process Industry (Case Study: Feasibility Study Projects in the Process Industry Sector in Indonesia)”, Eduvest - Journal of Universal Studies, 5(7), pp. 9336–9343. doi: 10.59188/eduvest.v5i7.50381.