SUGIH HARTONO, R.; RIYADI, S. .; BARATA, F. A. . Analysis of Non-Physical Waste Production Variables (Lean Six Sigma) on Project Time Management Through the Mediation of Lean Construction. Eduvest - Journal of Universal Studies, [S. l.], v. 5, n. 12, p. 14901–14914, 2025. DOI: 10.59188/eduvest.v5i12.52560. Disponível em: https://eduvest.greenvest.co.id/index.php/edv/article/view/52560. Acesso em: 16 feb. 2026.