FAJAR, I.; ZAKI, M. .; PONTAN, D. .; WIDIARSO, T. Cost Analysis of Construction Using the Cost Significant Model and Artificial Neural Network or Feasibility Study Cost Estimation in Process Industry (Case Study: Feasibility Study Projects in the Process Industry Sector in Indonesia). Eduvest - Journal of Universal Studies, [S. l.], v. 5, n. 7, p. 9336–9343., 2025. DOI: 10.59188/eduvest.v5i7.50381. Disponível em: https://eduvest.greenvest.co.id/index.php/edv/article/view/50381. Acesso em: 20 oct. 2025.