Nur Soleh, I., & Suef, M. (2026). Optimization of Preventive Replacement of Critical Components in the Komatsu PC2000-8 Excavator to Minimize Downtime at PT XYZ. Eduvest - Journal of Universal Studies, 6(8), 8712–8729. https://doi.org/10.59188/eduvest.v6i8.53324