Sugih Hartono, R., Riyadi, S. ., & Barata, F. A. . (2025). Analysis of Non-Physical Waste Production Variables (Lean Six Sigma) on Project Time Management Through the Mediation of Lean Construction. Eduvest - Journal of Universal Studies, 5(12), 14901–14914. https://doi.org/10.59188/eduvest.v5i12.52560