Tobing, P. R. (2025). Analysis of The Influence of Change Contract Order, Labor, Materials and Tools on the Performance of the Implementation Time Low-Rise State Building Project . Eduvest - Journal of Universal Studies, 5(8), 9632–9649. https://doi.org/10.59188/eduvest.v5i8.50876