[1]
Kurnia, D., Hidayat , A. and Amin , M. 2026. Analysis of the Effects of Work Method Selection and Monitoring of Work Execution on Construction Time and Cost Risks in Highway Projects. Eduvest - Journal of Universal Studies. 6, 6 (Jun. 2026), 6801–6816. DOI:https://doi.org/10.59188/eduvest.v6i6.53143.