[1]
Sasmita, A. 2025. Analysis of Road and Drainage Project Performance Control Using the Earned Value Method: A Case Study of Road and Drainage Work Row 46 Segment II Jakarta Garden City. Eduvest - Journal of Universal Studies. 5, 11 (Nov. 2025), 13726–13744. DOI:https://doi.org/10.59188/eduvest.v5i11.52275.