[1]
Subagyo, I. and Isradi, M. 2025. Analysis of Multi-Project Resources in Dam Construction on Java Island Affecting Contractor Performance. Eduvest - Journal of Universal Studies. 5, 9 (Sep. 2025), 10998–11013. DOI:https://doi.org/10.59188/eduvest.v5i9.51138.