[1]
Tobing, P.R. 2025. Analysis of The Influence of Change Contract Order, Labor, Materials and Tools on the Performance of the Implementation Time Low-Rise State Building Project . Eduvest - Journal of Universal Studies. 5, 8 (Aug. 2025), 9632–9649. DOI:https://doi.org/10.59188/eduvest.v5i8.50876.