[1]
Fajar, I., Zaki, M. , Pontan, D. and Widiarso, T. 2025. Cost Analysis of Construction Using the Cost Significant Model and Artificial Neural Network or Feasibility Study Cost Estimation in Process Industry (Case Study: Feasibility Study Projects in the Process Industry Sector in Indonesia). Eduvest - Journal of Universal Studies. 5, 7 (Jul. 2025), 9336–9343. DOI:https://doi.org/10.59188/eduvest.v5i7.50381.